Shotcrete

Thursday, September 14, 2017

Soldier piles are predrilled at intervals along the wall’s baseline. As the excavation in front of the wall proceeds, shotcrete lagging is installed between the soldier piles in lifts. Tieback anchors may be installed and stressed to provide lateral restraint.