City Walk Case Study

Thursday, September 14, 2017

A commercial property development company worked to construct a new a Whole Foods (grocery store). The proposed site is surrounded by apartments and a parking garage. For both areas, the existing utilities (both overhead and underground) created challenges. Additionally, the schedule was expedited as the shoring systems were to be installed before the building foundations could be installed.

Helitech CCD installed a soldier pile and lagging wall on the southwest corner of the property which borders Euclid and West Pine Boulevard. This type of system allowed us to stay clear of the existing utilities that ran below the streets. Helitech CCD installed a soil nail wall with shotcrete facing on the north wall. This allowed us to stay away from the overhead utilities and designed a system that could handle the heavy loads created by the hotel and apartment complex.