Project
Sector – Police Department
Location – Rock Island, Iowa
Application(s) – Ground Improvement, Vibratory Concrete Columns

Description

The City of Rock Island proposed to build a new Police Department. The main building at the new facility is L-shaped with a short leg.

Requirements & Challenges

Geotechnical borings indicated the site consisted of uncontrolled fill ranging from three to eight feet throughout the site. Below the fill is a layer of organics with high moisture contents above 200 percent and N-values from 1 to 5 blows per foot. This layer of organics ranged from 5 to 10 feet throughout the site.

The initial recommendation from the design team was to install aggregate piers to improve the soils to 3,500 psf with less than 1″ total settlement and ½” differential settlement.

According the FHWA guidelines, the thick layer of organics posed a problem as aggregate piers are not a viable solution when encountering organic soils with high moisture content.

Because organics with high moisture content release their pour water pressure much slower than typical soils – even with the installation of aggregate piers – settlement would continue for an extended period of time.

Solution

In considering the organic layer, Helitech’s engineers designed a Vibratory Concrete Column system that could penetrate the organic layer, improve the project site to the appropriate 3,500 psf, and limit the settlement to the design requirements.

Results

Testing in the field validated the design. The crew finished the project a week ahead of schedule.